Bay County's Highway 79 Communities, Phase by Phase

Along State Road 79 and West Highway 388 in northern Panama City Beach, homes are going up faster than the roads, stores and hospital beds planned around them. The St. Joe Company, the developer behind most of the communities named here, reported its third-quarter numbers on October 28, 2026. Put those figures next to the latest Bay County and FDOT records and they show the order things arrive in. Contracts come first, then rooftops, then a grocery store and a hospital, and widened roads come last. If you are comparing Latitude Margaritaville Watersound, Titus Park and the Ward Creek neighborhoods, you are really choosing where on that sequence you want to land.

The Contracts Are Running Ahead of the Closings

The clearest sign of where demand stands is at Latitude Margaritaville Watersound. In the third quarter of 2026, the community closed 67 home sales, down from 82 in the third quarter of 2025. Over the same quarter it signed 106 new contracts, up from 71, a 49% increase. The first nine months of 2026 look the same. Closings fell to 236 from 411 a year earlier, while new contracts rose 24% to 309 from 249.

Closings measure homes handed over this year, and contracts measure homes bought for later, so more buyers are committing now to homes that will be handed over later. As of September 30, 2026, 222 homes were under contract in the community at an average price of about $635,000, roughly $140.9 million in sales still waiting to close.

If you buy into this corridor today, you are probably signing for a home that does not exist yet. You will move in alongside neighbors who signed months before you, and the next groups of buyers will be signing behind you.

A Third of the Way Through 7,200 Homes

In September 2026, St. Joe sold more land to the Latitude Margaritaville Watersound joint venture. The contract is worth $50.4 million and adds about 3,500 homesites, which brings the planned community to roughly 7,200 homes. The price works out to about $14,400 per unit of raw land. The original 2020 deal averaged $10,000 per unit, so the land under phase two cost 44% more. A developer paying more for undeveloped ground in the same community is betting money on future demand there.

The joint venture had completed 2,426 home sales by September 30, 2026. That is about a third of the planned total. St. Joe's quarterly filing puts the new land at 3,557 acres in the West Bay Creek DSAP. WJHG reported that phase two will have another resort-style amenity center on the Intracoastal Waterway, with a groundbreaking projected for mid-2027. A buyer who moves into the finished part of phase one in 2027 will be living in the established part of a community that is still under construction, with years of building ahead next door.

Nearby, St. Joe has 1,326 homesites under contract in Havenry, in the Pigeon Creek area. The October 28 release also describes a new master-planned community for PulteGroup in the Pigeon Creek DSAP. It is planned for about 3,000 homes and expected to break ground in the first part of 2027. Bay County's projects-under-review list includes Havenry at Watersound Phase 1, a 352-lot subdivision on 1,522 acres north of West Highway 388, about a mile east of Highway 79. The application was received October 16, 2026, and the project is listed as pending.

Each Community Sits at a Different Point in Its Build-Out

St. Joe's quarterly filing breaks down its homesite pipeline by stage of development, community by community. For a buyer, the table answers a practical question. How much more of your own neighborhood is still to be built after you move in?

Community Platted or under development Engineering or permitting Concept plan only Total pipeline
Breakwater at Ward Creek 95 0 0 95
Bayside at Ward Creek 156 148 29 333
Salt Grass at Ward Creek 56 305 0 361
Titus Park 125 171 211 507
Breakfast Point East 0 85 171 256
Latitude Margaritaville Watersound 1,299 237 3,263 4,799
Havenry, Pigeon Creek 0 340 2,990 3,330

These are pipeline counts as of September 30, 2026, not homes sold. Within the Ward Creek group, Breakwater's remaining sites are all already platted or under development, so it is the closest to finished. Bayside is mostly platted, with a long engineering stage behind it. Salt Grass has more sites in engineering or permitting than in development. Titus Park is spread across all three stages. In Havenry and the phase-two land at Latitude Margaritaville, most of the sites are still at the concept-plan stage.

The same filing explains a figure that could look like a falling market. St. Joe's average base revenue per homesite sold was about $84,000 in the third quarter of 2026, down from about $150,000 a year earlier. Over the first nine months it was about $115,000, down from $127,000. The company attributes both drops to the mix of communities the sales came from. The averages fell because more of the sales came from lower-priced communities. They do not show prices being cut within a community.

The Services Are Following the Rooftops

Retail and medical services in this corridor are arriving after the homes. Watersound West Bay Center is the commercial town center St. Joe is building here, planned for at least 500,000 square feet of commercial space. As of the third quarter it had 33,182 square feet built and 69,134 square feet under construction. St. Joe's project updates page lists Electric Cart Watersound and Capital City Bank as businesses at the center. In December 2025, St. Joe announced a Publix of about 50,000 square feet for the center, with a pharmacy, deli, bakery and an adjacent liquor store. Bay County's review list also shows West Bay Center Spec 2, a 16,527-square-foot retail center on Gone Shopping Way. Its application is dated August 31, 2026, and it is listed as pending.

Medical care is open in part. The FSU Health and TMH medical office building at SR 79 and Philip Griffitts Sr. Parkway is open. TMH lists urgent care, outpatient surgery, primary care, a surgical procedure center, and specialties including cardiology and orthopedics. The hospital is going up on the same 87-acre campus. On November 5, 2026, WJHG reported that it is under construction, with up to 180 beds in its first phase and a planned opening in 2028.

St. Joe ties the commercial build-out directly to the homes. The release says Latitude Margaritaville's growth and the PulteGroup community will create continued demand for Watersound West Bay Center. On St. Joe's own reasoning, the town center's growth depends on the homes going up around it.

The Roads Are on a Longer Clock

Roads are the slowest part of the corridor to change. FDOT's project page for SR 388, from east of Burnt Mill Creek to SR 77, shows the design work complete. Right-of-way purchase and construction are not funded in the current Five-Year Work Program, according to data current as of August 4, 2026. Find the project status on FDOT's Northwest Florida roads site.

Philip Griffitts Sr. Parkway has an even longer timeline. In July 2025, the News Herald reported that Bay County commissioners had chosen the northernmost of three proposed routes for Phase III. The March 2026 environmental report covers about 5.1 miles from Clara Avenue to Chip Seal Parkway. Its funding table places $10.2 million of final design in 2031 to 2035 and $15 million of right-of-way and about $101.5 million of construction beyond 2045, and the report states that the source of construction funding has not been determined. The same report notes that SR 79 connects to Northwest Florida Beaches International Airport by way of SR 388.

Neither project has construction money in its current schedule, so the SR 79 and Highway 388 a buyer drives on a visit this winter are the roads to plan around.

Choosing Your Point on the Timeline

On the calendar, the PulteGroup groundbreaking and Latitude Margaritaville's phase two are both planned for 2027, the hospital opening for 2028, and construction on the SR 388 widening and the parkway extension has no funding in the current schedules. Breakwater at Ward Creek is nearly fully platted, so most of its building will be done once you move in. In Havenry or Latitude Margaritaville's phase two, you would be among the first homes in a plan that will take years to fill. Each choice has a different mix of finished amenities, ongoing construction and new homes competing with yours at resale.

If you are deciding where along Highway 79 to buy, Destin Sells Destin will sit down with you and work through what is planned around each homesite you are considering, phase by phase. Start with our Bay County neighborhood guide or reach out to our team, and we'll help you Find Your Emerald Coast Home on the timeline that fits you.